ארכיון Railway Planning - חסון ירושלמי https://hj-eng.co.il/en/property-category/4-railway-design-en/ תכנון הנדסה אזרחית Wed, 28 Jun 2023 13:57:00 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.3 https://hj-eng.co.il/wp-content/uploads/2021/11/cropped-hj-eng-favicon-32x32.pngארכיון Railway Planning - חסון ירושלמיhttps://hj-eng.co.il/en/property-category/4-railway-design-en/ 32 32 Bypassing Lod – National Infrastructure Plan – No. 79https://hj-eng.co.il/en/project/bypassing-lod-national-infrastructure-plan-no-79/ https://hj-eng.co.il/en/project/bypassing-lod-national-infrastructure-plan-no-79/#respond Tue, 15 Nov 2022 07:26:38 +0000 https://hj-eng.co.il/project/bypassing-lod-national-infrastructure-plan-no-79/The post Bypassing Lod – National Infrastructure Plan – No. 79 appeared first on חסון ירושלמי.

]]>
The project

Lod Bypass Planning – National Infrastructure Plan No. 79 – Promotion of a national infrastructure plan for the construction of a double track and an electrification system dedicated to cargo, which will also be used as a high-speed passenger line between Beer-Sheva and Tel Aviv, between the port of Ashdod and the railway track in the east including: construction of a bypass track to the city of Lod, a new station in the Gezer Regional Council (on the road 431) and a direct connection from the southern railway to the A1 railway parallel to road 431

Areas of work

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning

Length

22 km

Planning the Lod bypass railway – National Infrastructure Plan (N.L.P) No. 79

HJ-engineer

The post Bypassing Lod – National Infrastructure Plan – No. 79 appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/bypassing-lod-national-infrastructure-plan-no-79/feed/ 0
Road #44 Nir Zvi- Ramlahttps://hj-eng.co.il/en/project/road-2/ https://hj-eng.co.il/en/project/road-2/#respond Tue, 02 Nov 2021 14:36:46 +0000 https://hj-eng.co.il/project/road-2/The post Road #44 Nir Zvi- Ramla appeared first on חסון ירושלמי.

]]>
הפרויקט כולל

ביצוע הפרדות מפלסיות 132 ו-208 בכניסה לרמלה כשלב א’ לפרויקט שידרוג כביש 44 כולו.

תכולת העבודה

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

4 ק”מ

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning.

HJ-engineer

The post Road #44 Nir Zvi- Ramla appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/road-2/feed/ 0
Road 531 and the Sharon Railway from Road 20 to Road 6https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-531-%d7%95%d7%9e%d7%a1%d7%99%d7%9c%d7%aa-%d7%94%d7%a9%d7%a8%d7%95%d7%9f-%d7%9e%d7%9b%d7%91%d7%99%d7%a9-20-%d7%9c%d7%9b%d7%91%d7%99%d7%a9-6/ https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-531-%d7%95%d7%9e%d7%a1%d7%99%d7%9c%d7%aa-%d7%94%d7%a9%d7%a8%d7%95%d7%9f-%d7%9e%d7%9b%d7%91%d7%99%d7%a9-20-%d7%9c%d7%9b%d7%91%d7%99%d7%a9-6/#respond Thu, 01 Feb 2018 07:20:58 +0000 https://hj-eng.co.il/project/%d7%9b%d7%91%d7%99%d7%a9-531-%d7%95%d7%9e%d7%a1%d7%99%d7%9c%d7%aa-%d7%94%d7%a9%d7%a8%d7%95%d7%9f-%d7%9e%d7%9b%d7%91%d7%99%d7%a9-20-%d7%9c%d7%9b%d7%91%d7%99%d7%a9-6/Road 531

The post Road 531 and the Sharon Railway from Road 20 to Road 6 appeared first on חסון ירושלמי.

]]>
The project

Planning and execution planning for the construction of Highway 531 and the Sharon Railway including the construction of 9 interchanges along its length and 4 train stations.

Areas of work

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning

Length

14 km

The project includes the construction of the road and the construction of the following interchanges: 531/20, Herzliya – East, Haim Nachman Bialik, Ra’anana, Kfar Saba – South, Sokolov, Tel Hai, Elishma, Jaljulia, Horeshim, and the following train stations: Nordau, Sokolov, Ra’anana Center, Ra’anana West. Among other things, the works included bridging, retaining walls, development, and drainage.

HJ-engineer

The post Road 531 and the Sharon Railway from Road 20 to Road 6 appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-531-%d7%95%d7%9e%d7%a1%d7%99%d7%9c%d7%aa-%d7%94%d7%a9%d7%a8%d7%95%d7%9f-%d7%9e%d7%9b%d7%91%d7%99%d7%a9-20-%d7%9c%d7%9b%d7%91%d7%99%d7%a9-6/feed/ 0