ארכיון traffic and transport planning - חסון ירושלמי https://hj-eng.co.il/en/property-category/2-traffic-and-transportation-planning-en/ תכנון הנדסה אזרחית Wed, 28 Jun 2023 13:57:00 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.3 https://hj-eng.co.il/wp-content/uploads/2021/11/cropped-hj-eng-favicon-32x32.pngארכיון traffic and transport planning - חסון ירושלמיhttps://hj-eng.co.il/en/property-category/2-traffic-and-transportation-planning-en/ 32 32 Bypassing Lod – National Infrastructure Plan – No. 79https://hj-eng.co.il/en/project/bypassing-lod-national-infrastructure-plan-no-79/ https://hj-eng.co.il/en/project/bypassing-lod-national-infrastructure-plan-no-79/#respond Tue, 15 Nov 2022 07:26:38 +0000 https://hj-eng.co.il/project/bypassing-lod-national-infrastructure-plan-no-79/The post Bypassing Lod – National Infrastructure Plan – No. 79 appeared first on חסון ירושלמי.

]]>
The project

Lod Bypass Planning – National Infrastructure Plan No. 79 – Promotion of a national infrastructure plan for the construction of a double track and an electrification system dedicated to cargo, which will also be used as a high-speed passenger line between Beer-Sheva and Tel Aviv, between the port of Ashdod and the railway track in the east including: construction of a bypass track to the city of Lod, a new station in the Gezer Regional Council (on the road 431) and a direct connection from the southern railway to the A1 railway parallel to road 431

Areas of work

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning

Length

22 km

Planning the Lod bypass railway – National Infrastructure Plan (N.L.P) No. 79

HJ-engineer

The post Bypassing Lod – National Infrastructure Plan – No. 79 appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/bypassing-lod-national-infrastructure-plan-no-79/feed/ 0
Savyon New Neighborhoodhttps://hj-eng.co.il/en/project/%d7%a1%d7%91%d7%99%d7%95%d7%9f-%d7%a9%d7%9b%d7%95%d7%a0%d7%94-%d7%97%d7%93%d7%a9%d7%94/ https://hj-eng.co.il/en/project/%d7%a1%d7%91%d7%99%d7%95%d7%9f-%d7%a9%d7%9b%d7%95%d7%a0%d7%94-%d7%97%d7%93%d7%a9%d7%94/#respond Mon, 03 Jan 2022 13:28:37 +0000 https://hj-eng.co.il/project/%d7%a1%d7%91%d7%99%d7%95%d7%9f-%d7%a9%d7%9b%d7%95%d7%a0%d7%94-%d7%97%d7%93%d7%a9%d7%94/The post Savyon New Neighborhood appeared first on חסון ירושלמי.

]]>
3 פרויקטים:

ביצוע שכונת מגורים צמודת קרקע כהרחבה לזוגות צעירים,הפרוייקט כלל פתרון ניקוזי ייחודי.

תכולת העבודה

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

HJ-engineer

The post Savyon New Neighborhood appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/%d7%a1%d7%91%d7%99%d7%95%d7%9f-%d7%a9%d7%9b%d7%95%d7%a0%d7%94-%d7%97%d7%93%d7%a9%d7%94/feed/ 0
Main Urban Arterial Road in Rosh Hayin+ 2 New Neighborhoodshttps://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-%d7%a2%d7%95%d7%a8%d7%a7%d7%99-%d7%a2%d7%99%d7%a8%d7%95%d7%a0%d7%99-%d7%a8%d7%90%d7%a9%d7%99-%d7%91%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-2-%d7%a9%d7%9b%d7%95%d7%a0/ https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-%d7%a2%d7%95%d7%a8%d7%a7%d7%99-%d7%a2%d7%99%d7%a8%d7%95%d7%a0%d7%99-%d7%a8%d7%90%d7%a9%d7%99-%d7%91%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-2-%d7%a9%d7%9b%d7%95%d7%a0/#respond Mon, 03 Jan 2022 13:13:25 +0000 https://hj-eng.co.il/project/%d7%9b%d7%91%d7%99%d7%a9-%d7%a2%d7%95%d7%a8%d7%a7%d7%99-%d7%a2%d7%99%d7%a8%d7%95%d7%a0%d7%99-%d7%a8%d7%90%d7%a9%d7%99-%d7%91%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-2-%d7%a9%d7%9b%d7%95%d7%a0/The post Main Urban Arterial Road in Rosh Hayin+ 2 New Neighborhoods appeared first on חסון ירושלמי.

]]>
3 פרויקטים:

כביש עורקי עירוני ראשי במזרח ראש העין באורך 6 ק”מ, בין כביש 444 במערב לכביש 5, מחלף ראש העין מזרח בצפון מזרח.

הכביש הינו למעשה הכביש הראשי של השכונות החדשות במזרח ראש העין.

2 שכונות A ו C – תכנון כבישים וניקוז ב2 שכונות חדשות (מתוך 5) במזרח ראש העין.

תכולת העבודה

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

HJ-engineer

The post Main Urban Arterial Road in Rosh Hayin+ 2 New Neighborhoods appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-%d7%a2%d7%95%d7%a8%d7%a7%d7%99-%d7%a2%d7%99%d7%a8%d7%95%d7%a0%d7%99-%d7%a8%d7%90%d7%a9%d7%99-%d7%91%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-2-%d7%a9%d7%9b%d7%95%d7%a0/feed/ 0
Road 40- Lehavim Intersection (Idan Hanegev)https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-40-%d7%9e%d7%97%d7%9c%d7%a3-%d7%9c%d7%94%d7%91%d7%99%d7%9d-%d7%a2%d7%99%d7%93%d7%9f-%d7%94%d7%a0%d7%92%d7%91/ https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-40-%d7%9e%d7%97%d7%9c%d7%a3-%d7%9c%d7%94%d7%91%d7%99%d7%9d-%d7%a2%d7%99%d7%93%d7%9f-%d7%94%d7%a0%d7%92%d7%91/#respond Mon, 03 Jan 2022 12:54:10 +0000 https://hj-eng.co.il/project/%d7%9b%d7%91%d7%99%d7%a9-40-%d7%9e%d7%97%d7%9c%d7%a3-%d7%9c%d7%94%d7%91%d7%99%d7%9d-%d7%a2%d7%99%d7%93%d7%9f-%d7%94%d7%a0%d7%92%d7%91/The post Road 40- Lehavim Intersection (Idan Hanegev) appeared first on חסון ירושלמי.

]]>
הפרויקט כולל

מחלף חדש בכביש 40 במקום צומת להבים הקיים. הפרויקט כולל מחלף חדש במקום הצומת הקיים, גשר בכביש 31 מעל כביש 40 ו4 רמפות המחלף (מחלף יהלום).

תכולת העבודה

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

HJ-engineer

The post Road 40- Lehavim Intersection (Idan Hanegev) appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-40-%d7%9e%d7%97%d7%9c%d7%a3-%d7%9c%d7%94%d7%91%d7%99%d7%9d-%d7%a2%d7%99%d7%93%d7%9f-%d7%94%d7%a0%d7%92%d7%91/feed/ 0
Road 65 Golani-Masad Segmenthttps://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-65-%d7%91%d7%a7%d7%98%d7%a2-%d7%92%d7%95%d7%9c%d7%a0%d7%99-%d7%9e%d7%a1%d7%93/ https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-65-%d7%91%d7%a7%d7%98%d7%a2-%d7%92%d7%95%d7%9c%d7%a0%d7%99-%d7%9e%d7%a1%d7%93/#respond Mon, 03 Jan 2022 12:50:44 +0000 https://hj-eng.co.il/project/%d7%9b%d7%91%d7%99%d7%a9-65-%d7%91%d7%a7%d7%98%d7%a2-%d7%92%d7%95%d7%9c%d7%a0%d7%99-%d7%9e%d7%a1%d7%93/The post Road 65 Golani-Masad Segment appeared first on חסון ירושלמי.

]]>
הפרויקט כולל

הרחבת כביש 65 בקטע שבין מחלף שורש למחלף חמד לכביש דו מסלולי דו נתיבי
ו4 מחלפים חדשים במקום הצמתים הקיימים.

תכולת העבודה

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

10 ק”מ.

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

HJ-engineer

The post Road 65 Golani-Masad Segment appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-65-%d7%91%d7%a7%d7%98%d7%a2-%d7%92%d7%95%d7%9c%d7%a0%d7%99-%d7%9e%d7%a1%d7%93/feed/ 0
Road 5- Rosh Hayin East intersectionhttps://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-5-%d7%9e%d7%97%d7%9c%d7%a3-%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-%d7%9e%d7%96%d7%a8%d7%97/ https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-5-%d7%9e%d7%97%d7%9c%d7%a3-%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-%d7%9e%d7%96%d7%a8%d7%97/#respond Mon, 03 Jan 2022 12:43:28 +0000 https://hj-eng.co.il/project/%d7%9b%d7%91%d7%99%d7%a9-5-%d7%9e%d7%97%d7%9c%d7%a3-%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-%d7%9e%d7%96%d7%a8%d7%97/The post Road 5- Rosh Hayin East intersection appeared first on חסון ירושלמי.

]]>
הפרויקט כולל

מחלף חדש בכביש 5 לשיפור הנגישות לשכונות המזרחיות של ראש העין ולפארק אפק וחיבורם למרכז הארץ. הפרויקט כולל הרחבת כביש 5 באזור המחלף, רמפות לחיבור למחלף, גשר מעל כביש 5 ומעל נחל רבה.

תכולת העבודה

Physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

Physical planning of roads and intersection-geometry, traffic and transport planning.

HJ-engineer

The post Road 5- Rosh Hayin East intersection appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-5-%d7%9e%d7%97%d7%9c%d7%a3-%d7%a8%d7%90%d7%a9-%d7%94%d7%a2%d7%99%d7%9f-%d7%9e%d7%96%d7%a8%d7%97/feed/ 0
Lehavim Train Parkinghttps://hj-eng.co.il/en/project/%d7%97%d7%a0%d7%99%d7%95%d7%9f-%d7%a8%d7%9b%d7%91%d7%aa-%d7%9c%d7%94%d7%91%d7%99%d7%9d/ https://hj-eng.co.il/en/project/%d7%97%d7%a0%d7%99%d7%95%d7%9f-%d7%a8%d7%9b%d7%91%d7%aa-%d7%9c%d7%94%d7%91%d7%99%d7%9d/#respond Mon, 03 Jan 2022 12:36:44 +0000 https://hj-eng.co.il/project/%d7%97%d7%a0%d7%99%d7%95%d7%9f-%d7%a8%d7%9b%d7%91%d7%aa-%d7%9c%d7%94%d7%91%d7%99%d7%9d/The post Lehavim Train Parking appeared first on חסון ירושלמי.

]]>
הפרויקט כולל

הסדרת חניון רכבת להבים וביצוע חניון נוסף לשימוש צבאי להסעות לבסיסים באזור.
הפרויקט כלל גם הסדרת רימזור הצומת על כביש 1 מצפון לשכונה

תכולת העבודה

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning./h2>

HJ-engineer

The post Lehavim Train Parking appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/%d7%97%d7%a0%d7%99%d7%95%d7%9f-%d7%a8%d7%9b%d7%91%d7%aa-%d7%9c%d7%94%d7%91%d7%99%d7%9d/feed/ 0
Road #44 Nir Zvi- Ramlahttps://hj-eng.co.il/en/project/road-2/ https://hj-eng.co.il/en/project/road-2/#respond Tue, 02 Nov 2021 14:36:46 +0000 https://hj-eng.co.il/project/road-2/The post Road #44 Nir Zvi- Ramla appeared first on חסון ירושלמי.

]]>
הפרויקט כולל

ביצוע הפרדות מפלסיות 132 ו-208 בכניסה לרמלה כשלב א’ לפרויקט שידרוג כביש 44 כולו.

תכולת העבודה

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning.

אורך

4 ק”מ

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning.

HJ-engineer

The post Road #44 Nir Zvi- Ramla appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/road-2/feed/ 0
Road #1 Shoresh-Hemedhttps://hj-eng.co.il/en/project/road-1/ https://hj-eng.co.il/en/project/road-1/#respond Wed, 03 Jul 2019 05:56:20 +0000 https://hj-eng.co.il/project/road-1/הרחבת כביש 1 בקטע שבין מחלף שורש למחלף חמד ל 3נתיבים לכל כיוון ומחלף חדש נוה אילן במקום הצומת הקיים.

The post Road #1 Shoresh-Hemed appeared first on חסון ירושלמי.

]]>
הפרויקט כולל

הרחבת כביש 1 ל 3 נתיבים לכל כיוון, מחלף חדש נוה אילן, קירות תומכים, פיתוח וניקוז

תכולת העבודה

מתכנן ראשי, תנועה, גאומטריה (פיזי), ניקוז ותאום מערכות.

אורך

4 ק”מ

Hydrology and drainage planning, physical planning of roads and intersection-geometry, traffic and transport planning

HJ-engineer

The post Road #1 Shoresh-Hemed appeared first on חסון ירושלמי.

]]>
https://hj-eng.co.il/en/project/road-1/feed/ 0
Road 531 and the Sharon Railway from Road 20 to Road 6https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-531-%d7%95%d7%9e%d7%a1%d7%99%d7%9c%d7%aa-%d7%94%d7%a9%d7%a8%d7%95%d7%9f-%d7%9e%d7%9b%d7%91%d7%99%d7%a9-20-%d7%9c%d7%9b%d7%91%d7%99%d7%a9-6/ https://hj-eng.co.il/en/project/%d7%9b%d7%91%d7%99%d7%a9-531-%d7%95%d7%9e%d7%a1%d7%99%d7%9c%d7%aa-%d7%94%d7%a9%d7%a8%d7%95%d7%9f-%d7%9e%d7%9b%d7%91%d7%99%d7%a9-20-%d7%9c%d7%9b%d7%91%d7%99%d7%a9-6/#respond Thu, 01 Feb 2018 07:20:58 +0000 https://hj-eng.co.il/project/%d7%9b%d7%91%d7%99%d7%a9-531-%d7%95%d7%9e%d7%a1%d7%99%d7%9c%d7%aa-%d7%94%d7%a9%d7%a8%d7%95%d7%9f-%d7%9e%d7%9b%d7%91%d7%99%d7%a9-20-%d7%9c%d7%9b%d7%91%d7%99%d7%a9-6/Road 531

The post Road 531 and the Sharon Railway from Road 20 to Road 6 appeared first on חסון ירושלמי.

]]>
The project

Planning and execution planning for the construction of Highway 531 and the Sharon Railway including the construction of 9 interchanges along its length and 4 train stations.

Areas of work

Hydrology and drainage planning, rail planning, physical planning of roads and intersection-geometry, traffic and transport planning

Length

14 km

The project includes the construction of the road and the construction of the following interchanges: 531/20, Herzliya – East, Haim Nachman Bialik, Ra’anana, Kfar Saba – South, Sokolov, Tel Hai, Elishma, Jaljulia, Horeshim, and the following train stations: Nordau, Sokolov, Ra’anana Center, Ra’anana West. Among other things, the works included bridging, retaining walls, development, and drainage.

HJ-engineer